New ptj Issue 1-2019
Inline Inspection / Integrity Management
The new PALIMEX®-880/-855
The two-tape system reliably protects your pipeline – and saves your budget.
Quality control in the passive corrosion protection – the coating inspector
Thomas Löffler >>> DENSO Andre Graßmann, Hilmar Jansen >>> Open Grid Europe
The key of safety and reliable operation is the pipeline integrity. Main elements and importance of pipeline integrity
Ferenc Peterfalvi >>> MOL
Predicting the future - applying corrosion growth rates from in-line inspections
Jane Dawson >>> Baker Hughes, a GE company
Improving Pipeline Scraping Operation – A systematic Approach and Case Study
Husain Al-Muslim, Mousa Al-Harbi >>> Saudi Aramco

ptc_2019

FERC To Review Pipeline Policies in Face of Multiple Pipeline Spills

FERC To Review Pipeline Policies in Face of Multiple Pipeline Spills by Energy Transfer in Ohio (Joseph Sohm / Shutterstock)

Energy Transfer Partners troubled $4.2 billion Rover Pipeline, carrying fracked gas 1150 km across Pennsylvania, West Virginia, Ohio, Michigan and Canada, has had another accident with a spill of fluids into wetlands near the Tuscarawas River in Ohio.

The discharge of 570,000 liters of drilling fluids "lost down the hole" under the Tuscarawas has halted pipeline construction, at least for the time being. Three attempts to seal the hole have failed. This is the same site where more than 2 million gallons of the fluid – mixed with diesel – leaked last April and turned up in a wetland.

The state has sued Rover for $2.3 million over the cleanup costs from the first spill, after the pipeline’s owners refused to pay state fines. There’s no indication if the fluid in the latest spill contained diesel.

Energy Transfer is currently flying drones around the contaminated area to better monitor the situation.

Energy Transfer's misfortune may have consequences for the entire pipeline industry in the United States, as the Federal Energy Regulatory Commission (FERC) recently announced plans to review its pipeline policies for the first time since 1999, likely signaling more onerous regulations.

Add new comment

Subscription

Subscribe for free in order to get the next issue of Pipeline Technology Journal and the bi-weekly ptj Newsletter directly into your mailbox. You could unsubscribe at any time if you wish.

Subscribe

Contact

Admir Celovic
E-mail: ptj@eitep.de
Phone: : +49 (0)511 90 99 2-20



Contact Page
Go to top