Kinder Morgan’s 150-Mile Methane Pipeline Plan in Tennessee Triggers Safety Concerns

By Daniel Onyango
Time to read: 1 minute
The logo of Kinder Morgan on a smartphone screen (© Shutterstock/rafapress)
The logo of Kinder Morgan on a smartphone screen (© Shutterstock/rafapress)

Energy giant Kinder Morgan has unveiled plans for the Tennessee portion of its proposed "Southeast Connector," a 470-mile interstate methane gas pipeline system stretching across five Southern states.

The project involves trenching 150 miles of pipeline from north to south across Tennessee. The proposed route originates in Sumner County, near the Kentucky border northeast of Nashville, and cuts southward down to Marion County near Chattanooga.

Up to ten Tennessee counties—including Macon, Trousdale, Smith, DeKalb, Cannon, Warren, Coffee, and Franklin—could be impacted by the construction corridor.

The pipeline’s 48-inch diameter exceeds standard interstate natural gas lines, which typically average 30 inches and rarely exceed 42 inches.

Kinder Morgan expects to transport an initial 2.6 billion cubic feet of methane gas daily, with potential capacity expanding to 3.5 billion cubic feet per day.

The baseline volume alone could supply enough fuel to generate 17 gigawatts of electricity—equivalent to roughly 45% of the Tennessee Valley Authority’s total electric capacity.

However, environmental advocates and landowners have voiced strong criticism over non-disclosure agreements and safety hazards.

"This proposed pipeline is mammoth, and it could get even bigger," said Shelley Robbins, a utility expert at the Southern Alliance for Clean Energy.

"But Kinder Morgan isn’t telling the public who the end customers are. They have signed agreements with shippers that are being kept secret, so right now, we don’t even know who this pipeline is actually for."

The pipeline’s high pressure and volume present significant risks. Jasmine Vazin, deputy director of the Sierra Club’s Beyond Dirty Fuels campaign, noted that average pressure estimates yield a blast zone radius of almost half a mile.

Tennessee lacks state-level minimum setback distance regulations for homes and public spaces near pipelines, and a 2022 state preemption law prevents local governments from blocking fossil fuel infrastructure.

Kinder Morgan’s subsidiary, Southern Natural Gas, stated it will utilize 24/7 centralized monitoring, regular right-of-way inspections, internal integrity testing, and advanced corrosion protection systems.

The company targets a late 2030 in-service date as landowner notices proceed.