EUGAL Pipeline: 292 km of the project awarded to Bonatti and Max Streicher
Gascade, a subsidiary of BASF and Gazprom, has awarded the construction of 6 lots of the EUGAL Gas Pipeline to the Joint Venture between Bonatti and Max Streicher. The Pipeline will be powered by the Nord Stream 2, the gas transport network that connects Siberia to the heart of Europe via the Baltic Sea. The overall route of EUGAL is around 480 km long (Line 1 / 480 km; Line 2 / 329 km)