Conversion of DN 400 Opatovac-Slobodnica Oil Pipeline to Natural Gas Pipeline
Plinacro
Pipeline DN 400 Opatovac-Slobodnica of the total length of 105 km, was constructed in 1968 and its original purpose was to transport oil from Opatovac terminal to an oil refinery near Slavonski Brod, Croatia. When it was constructed it was made in five sections. Four of them was already converted to pipeline for natural gas transmission but the...