Permanent Realignment of an Operating High Pressure Petroleum Product Pipeline Through HDD
Permanent Realignment of an Operating High Pressure Petroleum Product Pipeline Through HDD
Humkhad Nala at Chainage 49.07 km of the PAJPL Una Branch Pipeline experienced recurring washouts during successive monsoon seasons, necessitating permanent realignment of the affected section. A single 854 m Horizontal Directional Drilling (HDD) crossing was constructed, placing the 12.75-inch OD pipeline at a maximum depth of approximately 55 m...